The remaining parts have been delivered from Israel Newton & Sons Ltd, riveting the smokebox front to the wrapper has been completed, along with the strengthening rings, and all the rivets are being ground flush. The front bracket has been trial fitted ready to be secured to the cylinder block, and the doubling plates riveted in place. To allow a trial fitting of the smokebox/tube plate it was secured in place by one bolt and some threaded rods.Two brackets to attach the tube plate to No 9 has been sourced, cut to size and drilled. More drilling and riveting to follow. Thanks once more to all who help in her return to steam!
![]() |
| 2nd delivery from Israel Newton & Sons Ltd |
![]() |
| Front bracket attached for a trial fit. Bolted to cylinder block & smokebox front. |
![]() |
| LH doubling plate getting riveted. |
![]() |
| Smokebox riveted! Superb work by Nathan & Doug Paul. |
![]() |
| Dart bracket riveted - flat both sides. |
![]() |
| Rivets being ground down on face. Jamback on chair. |
![]() |
| Front tube plate in wrapper. Secured for a lift to the engine. See next photo. |
![]() |
| Threaded rods securing the lower part. |
![]() |
| Raising the smokebox/tube plate. |
![]() |
| Trial fitting. |
![]() |
| Front tube plate bracket measured - ready to be plasma cut. |
![]() |
| Angle iron we cut from length and in half with many cutting discs! |












No comments:
Post a Comment