The Task in hand!

Work on the overhaul of Austerity No9 started in June 2019. The blog was started in June 2021 so photos and text will be added as the work progressed through that period. Because of the Covid pandemic work was interupted during that time but the intention is to restore Austerity No9 to working condition as an N.C.B locomotive in blue. Work continues.............

30 October 2026

Tube plate to smokebox.

The remaining parts have been delivered from Israel Newton & Sons Ltd, riveting the smokebox front to the wrapper has been completed, along with the strengthening rings, and all the rivets are being ground flush. The front bracket has been trial fitted ready to be secured to the cylinder block, and the doubling plates riveted in place. To allow a trial fitting of the smokebox/tube plate it was secured in place by one bolt and some threaded rods.Two brackets to attach the tube plate to No 9 has been sourced, cut to size and drilled.  More drilling and riveting to follow. Thanks once more to all who help in her return to steam!

 

2nd delivery from Israel Newton & Sons Ltd

Front bracket attached for a trial fit. Bolted to cylinder block & smokebox front.
 
LH doubling plate getting riveted. 

Smokebox riveted! Superb work by Nathan & Doug Paul.

Dart bracket riveted - flat both sides.

Rivets being ground down on face. Jamback on chair.

Front tube plate in wrapper. Secured for a lift to the engine. See next photo.

Threaded rods securing the lower part.


Raising the smokebox/tube plate.

Trial fitting.

Front tube plate bracket measured - ready to be plasma cut.

Angle iron we cut from length and in half with many cutting discs!

11 October 2026

Smokebox assembly.

 A long post this time - but a lot completed. We are still waiting for the remaining parts from Israel Newton & sons Ltd (due to carrier issues) but lots of things are needing done before they arrive. The boiler barrel has been brought into the Shed on 1 road and Benny McInnes has been working on it. The smokebox front has had the 2 strengthening rings bolted on and that, and the wrapper. have been bolted together, and the holes countersunk for riveting. The doubling plates (smokebox side stiffeners) are now on (we found a plug from the Rotabroach drilling lodged between them - removed!). The saddle tank was inverted and filled with water and a small hole was discovered which has been patched. The rest still to be grit blasted - awaiting dry weather when we are on Shed! On Saturday 10th October the smokebox was trial fitted to No 9, and after some fettling is sitting nicely in place. The front bracket has been drilled to accommodate the bolts to the cylinder block casting. Steady and visible progress being made.

Both strengthening rings on smokebox plate. Door hinges on temporarily.
 
Firebox stored in wagon for the time being.

Holes drilled and bolted wrapper to front plate.

Rotabroach comes into its own on curve!

 LH doubling plate (smokebox side stiffener) clamped and partially bolted.

Boiler barrel on 1 road. Benny doing some remedial welding.

Barrel braced.

Benny's weld.

RH side of smokebox - all ready for riveting.

Trial fitting - nicely done!

Smokebox trial fitted. Front bracket can be seen and dart brackets. See next photo.

Front bracket - 5 holes drilled.
I'll not wait so long until the next posting! Again thanks to all who help in her restoration.