During '94 & '95 Rob Law's father Graham, active on the railway from 1978 to 2003, took photos of No 9 working at various places on the railway. They provide a history of the brief period that she was in steam, possibly as few as 9 times. She was then placed in storage until the restoration commenced in 2019. Each photo has a description. She was painted in the Strathspey Railway's colours at the time.The 1st group were taken in September 1994 & the 2nd in October 1995. Thanks to Rob for permission to post these great photos.
![]() |
| Coaling on the 2nd September 1994 at Boat of Garten. |
![]() |
| Again on the 4th September 1994. |
![]() |
| Passing south cabin 4th September '94 |
![]() |
| Leaving Boat of Garten 4th September '94 |
![]() |
| On route to Aviemore Speyside Station 4th September '94 |
![]() |
| Coming off the train at Speyside. |
![]() |
| Running round the train. |
![]() |
| Passing the Aviemore cabin to attach for the return journey. 4th September '94. |
![]() |
| On the return at the crossing. |
![]() |
| At the distant signal approaching Boat of Garten. |
This next set was taken on the 15th October 1995, on a driech day but with the benefit of lots of steam and smoke to show! Weather improved later.
![]() |
| Departing Boat of Garten in some style! |
![]() |
| Getting away! |
![]() |
| Powerful engine. |
![]() |
| On track to Aviemore Speyside. |
![]() |
| Same day in sunnier times on the return to BofG. |















No comments:
Post a Comment