Work on the overhaul of Austerity No9 started in June 2019. The blog was started in June 2021 so photos and text will be added as the work progressed through that period. Because of the Covid pandemic work was interupted during that time but the intention is to restore Austerity No9 to working condition as an N.C.B locomotive in blue. Work continues.............

3 June 2026

Smoke box & saddle tank

Nathan wanted to trial fit the smoke box and the saddle tank to Austerity No 9 (Works No 7097) to check that everything was still in order for further work to continue on them. On the 1st of June we moved No 9 down to the bottom yard with the smoke box already in situ to where the tank had already been placed. Nathan manoeuvred the tank into place using the tele-handler and we transported No 9 back into the Shed. Some adjustment was required by Alan, using a small jemmy, to site the front end of the tank onto the studs. The LH bracket is not true and needs straightening but the RH one accepted the 6 bolts. Further investigation and work will now take place.   
 
Smoke box ready.
 
 

The saddle tank being positioned by Nathan.

 

No 9 back in the Shed.

Saddle tank down on studs!

Alan taking a bow! Jemmy resting!

Tank settled on smoke box. As Brian W commented - 
"It's a long punt to the end" 

6 bolts on RH side in place. 
 
Driver's view - something to look forward to!


                                                                