On the 2nd of November the remainder of the saddle tank was shot blasted and 3 days later Murray Duncan primed it. It was then moved under cover onto 6 road until further work is done. The chimney, lying outside for a long time, was taken into the Shed and the old threaded studs burnt out. These had already been partly drilled out. Cleaned and tapped we inserted 7 bolts. Threaded studs will be used to fix it in position. As you can see from the picture a chunk has been knocked out which will required welding back in. It will also be shot blasted. Alan plasma cut the hole for the chimney in the smokebox, which had previously been marked out by Israel Newton & Sons Ltd. Video in that section of the Blog. The steam pipe, hidden in one of the wagons, was found eventually, and fitted in the smokebox along with the elbow to complete the puzzle! The end crinoline fixtures were salvaged to be used again and the straps were scrapped. Once more thank you to all who help in her restoration!
![]() |
| Preparing to shot blast the tank. |
![]() |
| Alan doing part of the top. |
![]() |
| Top finished. |
![]() |
| Murray Duncan priming the tank on the 5th November. |
![]() |
| Tank priming complete. |
![]() |
| Chimney transport to Shed! Not easy over soft ground! |
![]() |
| Old studs burnt out, holes tapped and 7 bolts inserted. 1 to go where the chunk is missing. |
![]() |
| Steam pipe and elbow on tube plate. |
![]() |
| Crinoline fixtures recovered. Crinoline straps scrapped. |