Work on the overhaul of Austerity No9 started in June 2019. The blog was started in June 2021 so photos and text will be added as the work progressed through that period. Because of the Covid pandemic work was interupted during that time but the intention is to restore Austerity No9 to working condition as an N.C.B locomotive in blue. Work continues.............

22 August 2023

Removing the tyres from the leading & trailing wheelsets.

 21st August - A great way to start the week! 
A ring of fire, designed to heat the tyres on No 9 's wheelsets to about 260°c +, constructed by Alan French, was used for the first time and proved ideal for the job - of course! The expansion of the tyres allow them to be removed, with some persuasion! The wheel centres never got more than 35°c. See video section for more action. All 4 tyres were removed during Monday - a job well done!
The eccentics were removed from the driving set the previous Saturday.

Eccentrics removed for cleaning, grit blasting and protecting.

The ring of fire being tested. 110 small holes drilled on the tube.

A nice even flame on the tyre.

The first tyre is off the wheel!

Axle up ended and 2nd tyre being heated.

Both tyres removed.

All 4 tyres removed. 

Nick Thompson, Roddie McRae, Alan French & Brian Thomson.  Nathan Lightowler on 5th hammer!.