The internal supports for the bunker have been riveted in place, primed and top coated in black. Possibly never to be seen again as 2.3 tons of coal will be covering them! The bunker and cab roof have been given a top finish coat of black (as promised) and the cab has also been given a top finish of black. The riveting on the coal door has been done, along with a straightener/strenghtener. 2 countersunk bolts had to be used at the top on one side as it was impossible to rivet inside the locker.The window frames have been fitted, although the glass will be put in at a later date. New guard irons have been sourced and another job will be the vacuum brake pipework which required making new brackets.